Details: dismantaling/collapsed dsr bailey type unit steel bridge of (24r) loading having 3.27 mtr. width in/c stacking the serviceable steel deck panel, bearing and post etc. as per direction of the eng-in charge. launching of bailey bridge type unit steel bridge in/c loading and unloading and carrying of the bridge component from existing site and stacking to the work site as per direction of the eng-in charge. [ requisite components may be assembled from pwd(r&b) office any where in tripura] providing fitting and fixing of transom clamp of bailey bridge complete as per direction of the engineer-in-charge. providing , fitting and fixing deck nut & bolt of bailey bridge complete as per direction of the engineer-in-charge. providing fitting and fixing of panel pin of bailey bridge complete as per direction of the engineer-in-charge. providing fitting and fixing of short chord nut & bolts of bailey bridge complete as per direction of the engineer-in-charge. in every nuts & bolts of baily br
Sector: Buildings