Details: repair to holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with 75 mm b.m, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per mord technical specification clauses 1900, 502, 503 and 504. flat brick soling.providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kn as per mord technical specification clause 412. brick edging laid length wise.providing and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and crosssection shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the
Sector: Buildings