Details: excavation for structuresa. without dewatering.earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.i. ordinary soili) upto 3 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200.i. sand filling providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & mord technical specifications clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).i. p.c.c grade m 10i) nominal mix 1:3:6 plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & mord technical specification clauses 802, 804, 805, 806, 807, 900, 1202 & 1204. (
Sector: Buildings