Details: sh: site clearance clearing grass and removal of .clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per mord technical specification clause 201.by manual means. sh: earthwork compacting original ground (ii) compacting original ground supporting subgrade.loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per mord technical specification clause 303.5.2. compacting original ground.(i) compacting original ground supporting embankment.loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per mord technical specification clause 301.4.1. (iii) excavation in
Sector: Buildings