Details: excavation for roadway in soil by mechanical means with dozer including cutting and pushing the earth ton site of emabankment upto a distance of 100m, including trimming bottom and side slopes in accordance with requiremnets of lines,grades and cross-sections asper mord technical specification clause 302.3. flat brick solingproviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kn as per mord technical specification clause 412. flat brick solingbrick edging laid length wiseproviding and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and crosssection shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kn as
Sector: Buildings