Details: road side pucca drains.construction of road side pucca drain with m10 (1:3:6 with jhama brick aggregate) to specified lines, grades, levels and dimensions as per approved design and mord technical specification clause 307, 1606. excavated material to be used in embankment at site. (including centering, shuttering, etc. but excluding reinforcement)b. trapezoidaldrain(topclearwidth600mm,bottom clear width 300 mm and clear depth of 400 mm)( i ) in ordinary soil excavation for structures( a ) without dewatering.earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.( i ) ordinary soil(,i ) upto 3 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200.( i ) sand filling ba
Sector: Buildings