Details: construction of embankment with material obtained from roadway cuttingconstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement oftables 300.1 and 300.2 as per mord technical specification clause 301.5.a for spreading beyond 100 m (iii) excavation in soil using hydraulic excavator and tippers with disposal upto 1000 mexcavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per mord technical specification clause 302.3. (i) road side pucca drainsconstruction of road side pucca drain with m10 (1:3:6 with jhama brick aggregate) to specified lines, grades, levels and dimensions as per approved design and mord tec
Sector: Buildings