Details: removal of unsuitable soil with disposal upto 1000 m removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment / subgrade, replacement by suitable soil, which shall be paid separately as per mord technical specification clause 303.5.2 and as per mord technical specification clause 302.3.11 filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200 sand filling plain/reinforcedcement concrete in substructurecomplete including formwork as per drawings & mord technical specification clauses802,804,805,806,807,900,1202 1204. (includingcentering,shuttering,stagingetc.but excluding reinforcement) iv) rcc grade m 20 supplying, fitting, &placingthermo-mechanically treated bar/ cold twisted deformed steel bar reinforcement in superstructure complete as per drawing & mord technical specifications clauses 1002, 1010 & 1202 construction of unlined surface drains of average cros
Sector: Buildings