Details: site clearance clearing grass and removal of rubbishclearing grass and removal of up to a distance of 30 m outside the periphery of the area as per mord technical specification clause 201.by manual means scarifying existing bituminous surface to a depth of 150 mm by mechanical meansscarifying existing bituminous road surface by mechanical means to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per mord technical specification clause 301.4. dismantling of structures. dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per mord technical specification clause 202.(i) by manual meansb) cement concrete dismantling of structures. disman
Sector: Buildings