Details: sh:site clearance clearing grass and removal of rubbishclearing grass and removal of up to a distance of 30 m outside the periphery of the area as per mord technical specification clause 201.by manual means sh:granular sub-bases, bases (non-bituminous) and shoulders/miscellaneous items for roads 80 mm thick factory made c.c. interlocking paver block of m-35 gradeproviding and laying factory made chamfered edge cement concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using pu or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate , filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic pa
Sector: Buildings