Details: items earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -all kinds of soil dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of to the dumping ground with all leads and lifts etc.complete as per direction of the engineer- in-charge. providing, mixing and applying bonding coat of approved adhesive on chipped portion of rcc as per specifications and as per direction of engineer-in-charge complete in all respect..sbr polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surfacearea mixed with specified proportion of approved polymer 15 mm cement plaster on the rough
Sector: Power Sector