Details: excavation for structure (a) without dewatering earthwork in excavation for structure as per drawing and mord technical specifical clause 305.1 including setting out,construction of shoring,shuttering & braching,removal of stumps and other deleterious materials and disposal upto a lead of 50m,dressing of sides & bottom and backfilling in trenches with excavated suitable material. i. ordinary soil (i) upto 3m depth filling in foundation trenches as per drawing & mord technical specification clause 305,3.9,1200. i. sand filling providing concrete for plain concrete ( using jhama b
Sector: Buildings