Details: excavation for structuresa. with dewatering earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i ordinary soil(i) upto 3 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200.i sand filling providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & mord technical specifications clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excludingreinfo
Sector: Buildings