Details: excavation in cutting in soil by manual means with lead upto 50 m excavation in roadway cutting in soil by using manual means for carrying of cut earth to embankment site with all lifts and lead upto 50 m as per mord technical specification clause 302.3. brick soling ii) flat brick soling providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kn as per mord technical specification clause 412. iv) brick edging laid length wiseproviding and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross- section shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the
Sector: Buildings