Details: clearing grass and removal of rubbishclearing grass and removal of up to a distance of 30 m outside the periphery of the area as per mord technical specification clause 201.by manual means compacting orginal ground supporting subgrade.loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per mord technical specification clause 303.5.2. construction of embankment with material obtained from borrow pitsconstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per mord technical specification clause 301.5. construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to re
Sector: Buildings