Description: Maintenance of Road from Bagaban Chowdhury Chowmuhani to Joyram mudi para during the year 2024 25 SH Grouting PatchWBM III Carpeting seal coat etc L 400 00 mtr Name of Work Maintenance of Road from Bagaban Chowdhury Chowmuhani to Joyram mudi para during the year 2024 25 SH Grouting PatchWBM III Carpeting seal coat etc L 400 00 mtr
Details: Patch repairing/ Maintenance of bituminous surface road using 500 Jhama brick aggregate & Viscosity Graded bitumen (VG-30) Repairing -holes and making up small depressions with ramming or power rolling after removal/ disposal of disintegrated materials within a lead of 50 m, cutting holes to regular shapes with vertical edges and levelling the bottom, cleaning the same with compressed air or any other appropriate method including screening, cleaning of aggregates; and filling up withwith jhama chips using bitumen of VG-30 @ 54 kg per m3 of loose volume of jhama brick chips, after applying tack coat of bitumen on sides and bottom @ 0.75 kg/ sqm and finishing the top of repaired surface levelled with adjoining area in proper grade and camber including spreading of sand @ 0.006 / sqm of prepared road surface as per direction of the Engineer-in- Charge and all as per MoRD technical specification Clauses 1900, 502, 503 and 504. WBM grading - 3.
Sector: Buildings