Details: preparation of feasibility study report including general arrangement drawings (gad),cross sections, detailed alignment plan, cost estimate, rfp etc for construction of double lane flyover from radha nagar to igm hospital via north gate, colonel chowmuhani, bidurkartachowmuhani,rms chowmuhani in agartala, tripura. tentative length = 2.07kms) as per the tor
Sector: Buildings