Details: excavation for structures earthwork in excavation for structures as per drawing and mord technical specification clause 305.1 including setting out, dewatering, construction of shoring, shuttering & braching, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i) ordinary soil (i) up to 3.00 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9.1200. i) sand filling providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including form work as per drawing & mord technical specifications clauses 802,803, 900,1202 & 1203. (including centring, shuttering, staging etc. but excluding reinforcement). i. pcc grade m10 (using jhama brick aggregate) (i) nominal mix 1:3.6 providing concrete for plain/reinforced concrete in open foundations complete including formwork as per dra
Sector: Buildings