Details: removal of unsuitable soil with disposal upto 1000 mremoval of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment / subgrade, replacement by suitable soil, which shall be paid separately as per mord technical specification clause 303.5.2 and as per mord technical specification clause 302.3.11. wbm grading - 3providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading- 3 as per mord technical specification clause 405.(a) by manual means tack coat using hot straight run bitumen of grade vg-30 on w.b.m.providing and applying tack coat using hot straight run bitumen of grade vg
Sector: Buildings