Details: maintenance of earthen shoulder (stripping of excess soil):stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at omc as per drawing and mord technical specification clause 1903. construction of embankment with material obtained from borrow pits:construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 10000 m as per mord technical specification clause 301.5 a. without dewatering.earth work in excavation for structure as per drawing and mord technical specification clause 305.1 in/c setting out construction of shoring & bracing removal setting out construction of shoring & bracing removal of stumps & other deleterious materials and disposal upto a lead of 50m dressing of sides & bottom and backfilling in trenches with excavated suitable materials.i) or
Sector: Buildings