Details: removal of unsuitable soil with disposal upto 1000 mremoval of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment / subgrade, replacement by suitable soil, which shall be paid separately as per mord technical specification clause 303.5.2 and as per mord technical specification clause 302.3.11. ii) flat brick solingproviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kn as per mord technical specification clause 412. iii) brick edging laid in full brick widthproviding and laying brick edging on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling th
Sector: Buildings