Details: excavation for structuresa. without dewatering earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal up to a lead of 50m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. l. ordinary soil (i) up to 3 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200. (i)sand filling providing concrete for plain (uising jhama brick aggregates ) in open foundations complete including formwork as per drawing & mord technical specification clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement). p.c.c grade m10 (i)normal mix 1:3:6 providing concrete for plain /reinforced concrete in open foundations complete including formwork as per drawing &
Sector: Buildings