Details: a-road work construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per mord technical specification clause 301.5 surface drainsconstruction of unlined surface drains of average cross sectional area 0.40 sqm in ordinary soil to specified lines, grades, levels and dimensions. excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per mord technical specification clause 307.i) surface drains in ordinary soil a) manual means water bound macadam sub-base / base using jhama brick aggragate2) wbm grading 3providing, laying, spreading and compacting jhama brick aggregates of specific sizes water bound macadam specification including spreading in uniform thickness, hand packing rolling wit
Sector: Buildings