Details: code no.2.8.1:- earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds of soil code no:4.1.8:- providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) code no.4.3.1 centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns code no.5.1.2providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering,shuttering,finishing and reinforcement -all work upto plinth level : 1:1.5:3 (1 cement : 1 .5 coarse sand : 3
Sector: Social Development