Details: code no: 15.7.4: demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead - in cement mortar code no: 2.8.1: earth work in excavation by mechanical means (hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms , lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m -all kinds of soil. code no:2.27: supplying and filling in plinth with sand under floors including, watering, ramming consolidating and dressing complete. code no :4.1.10: providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- all work upto plinth level -1:5:10 (1 cement:5coarse sand : 10 graded stone aggregate 40mm nominal size). code no : 6.1.2: brick work with common burnt