Details: supply and of gi lattice tower columns for the proposed bay extension using hot dipped galvanized steel members and gi fasteners, matching to the existing tower columns. supply and of gi lattice booms for the proposed bay extension using hot dipped galvanized steel members and gi fasteners, matching to the existing tower columns supply and of ct support structures made out of hot dipped galvanized steel along with suitable hdgi. fastners. supply and providing earth electrodes using 40mm dia. and 3 mts. long ms rod with take-off clamps at the top complete with necessary ground enhancement chemical and assoicated consumables as per relevant industrial practices dismantling of the existing station transformer along with its associated ss pillar and distribution pillar and re- of the same in an alternate location as per the instructions of the substation in charge, including necessary civil works and associated cabling, earthing, etc. dismantling of the existing 11kv capacitor contr
Sector: Power Sector