Description: REPAIR TO DRAIN PATH CULVERT SEWAGE LINE FENCING AND MISC WORKS OF NHO UNDER AGE B R III OF GE CLEMENT TOWN DEHRADUN Name of Work REPAIR TO DRAIN PATH CULVERT SEWAGE LINE FENCING AND MISC WORKS OF NHO UNDER AGE B R III OF GE CLEMENT TOWN DEHRADUN
Details: Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5m deep in soft/loose soil for foundation, etc. or for shafts, wells, cesspits, manholes, pierholes, etc. and getting out complete all as specified and directed by Engr-in-Charge. M&L for returning filling in soft/loose soil including spreading levelling watering and well ramming in layers n.exc 25 cm thick complete all as specified and directed by Engr-in-Charge. M&L for removing excavated material (Soils) to a distance not exceeding 50 m and depositing where directed at a level n.exc. 1.5 m above the starting point complete all as specified and directed by Engr-in-Charge. M&L 200mm internal dia of pipe salt glazed stoneware drain pipes grade 'A', laid in trenches and jointed in cement & sand mortar 1:1, incl demolition and breaking up drain pipes (SGSW) of 200mm bore complete all as specified and directed by Engr-in-Charge. M&L for concrete bed in PCC 1:3:6 type C-2 (using 40 mm graded stone aggregate) as in bed to
Sector: Defense