Description: Reconditioning of 11 KV Power Supply System of DS 3 and 415 V LT Power Supply System of Administrative building Name of Work Reconditioning of 11 KV Power Supply System of DS 3 and 415 V LT Power Supply System of Administrative building
Details: FW0320000041Transportation and laying of HT/LT cable size 35 to 300 sq mm, 3C/3.5C, XLPE/PILCA in already laid RCC pipe/ prepared trench/ basement on MS angle iron cable racks/ inserts. Cable is to be fixed on wall/ girder at a distance of 50 to 60 cm approximate and with the help of MS/GI clamps/ clips duly painted. It also includes removing and fixing of slab on trench/ cleaning wherever required after satisfactory completion of work. (cable will be supplied by BHEL) FW0320000042Transportation, laying and commissioning of HT/LT, 3C/3.5C, 35 to 300 sq mm, 3C/3.5C, XLPE/PILCA/ PVC cable or control cable of different sizes conforming to IS : 1554 part-I laid in ground ordinary soil trench at the depth of 1000 mm and width of 500 mm complete with digging of trench, putting sand and bricks for protection and backfilling, making good the same etc providing and spreading of sand and bricks, cable identification route markers are also to be erected at every 20 meter as per the instruct
Sector: Power Sector