Details: supply of items :- shackle insulator 100x115 lt clamp sp-21(50x6) stay insulator 90x65 stay clamp sp-21 (50x6) pp&clamp sp-23 stay clamp sp-23 earth wire clamp sp-23 bracing clamp top sp-23 bracing clamp bottom sp-23 alu. lugs 120 sqmm 11 kv xlpe hs cable j/k 3x120 sqmm shackle insulator clamp sp-10 earth wire clamp sp-10 stay clamp sp-10 s/e labour charges :- cartage of st pole 8.0 mtr sp- 10 from store centre to construction site with loading, unloading at both points and proper stacking (71-100km) cartage of st pole 8.5 mtr sp- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (51-70km) cartage of st pole 8.5 mtr sp- 21/23 from store centre to construction site with loading, unloading at both points and proper stacking (71-100km) cartage of material (other than poles) by vehicle from store center to nearest construction site store including loading and unloading at both ends (51-70km) cartage of material (other than poles) by ve
Sector: Power Sector