Details: trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, byspreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). (610sqm*0.3m) supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (cattle manure measured in stacks will reduced by 8% for payment). providing and fixing m. s. tree guard 50 cm square in plan, height 1.40 metre above ground level and 0.50 metre below ground level. the vertical members shall consist of four nos of angle iron of size 25x25x5 mm 1.9 long, one at e
Sector: Power Sector