Details: work of doing mri of kcc consumers having load upto 75 kw and jal sanshtan and state tubewells in any category by 8th day of every month. in above work detailed mri report with phaors, instantaneous parameters, monthly consumption, tamper event report, load survey repot etc. shall be provided in hard copy as well as in soft copy to edd doiwala. cost of manpower engaged, vehicle utilised, fuel expenditure, mri cost, paper, soft media like cd/pendrive/hard disk etc. shall be inclusive in above rates. however taxes shall be paid extra as per actuals.
Sector: Power Sector