Details: transportation of suitable truck mounted drilling machine with all necessary accessories connectiing t&p required for drilling and correction of including leveling etc. complete with all respect as per direction of the engineer in charge. drilling of bore size attachment required drilling in alluvial, bolder, pobbles gravels, rocky stone sticky clay etc. inlucind costof attachment consuble store bits, water supply of 175 mm dia thick ms erw casing pipe from approved manufacters development compressor. of tubewell by air development of tube well in accordance with is : 2800 (part i) and is: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "v" notch method or any other approved method, measuring static level & dr
Sector: Agri Marketing