Description: Jungle Clearance De silting and Channeling from RD 0 000 km to RD 0 300 km of MV 54 Sub minor II Canal Name of Work Jungle Clearance De silting and Channeling from RD 0 000 km to RD 0 300 km of MV 54 Sub minor II Canal
Details: Clearing shrub jungles,uprooting stumps and small bushes and trees below 1.00m girth on pre measurement etc. Complete in all respects with all labour charges, T & P etc. and as per the direction of the Engineer-in-Charge. Earth work in excavation of foundation in hard soil or gravelly soil within Initial lead and lift including dressing and levelling the bed and depositing the soil away from the working area etc.Complete in all respects with all labour charges,T&P charges, CESS etc. and as directed by the Engineer-in- Charge Filling foundation and plinth with sand of approved quality free from any objectionable material well watered and rammed including all cost, conveyance, royalty, cess and taxes of materials, excluding GST, but including labour charges etc .Complete with all leads, lifts, delifts etc as per specification and direction of the Engineer in charge. Cement concrete of design mix of M10 grade having specified characteristic compressive strength of 10N/mm2 in desi
Sector: Irrigation