Details: dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead earth work in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and as per direction of the department filling in foundation and plinth with filling sand, watered and rammed laterite/khondolite stone in (1:2) cement mortar for plane work cost of stone wall painting 2 coat with weather coat paint of approved shade on old work to give an even shade including cost of paint provision for lightining arrestar photography (items wise)
Sector: Culture and Art