Details: earth work excavation in foundation in hard soil with in initial lead and lift including rough dressing and levelling the beds filling in foundation with sand in foundation and plinth well p.c.c.( 1.3:6 ) using 40 mm size h.g. metal well rammed with cost conveyance royalty taxes of all material and all labour t&p etc complete p.c.c.( 1:1.5:3 ) using 20 mm size h.g. chips well rammed with cost conveyance royalty taxes of all material and all labour t&p etc complete rigid,smooth centering and shuttering for r.c.c.work with false work and dismentling after casting including (for drain) rigid,smooth centering and shuttering for r.c.c.work with false work and dismentling after casting including (for culvert) supplying fitting & placing uncoated hysd bar reinforcement complete as per technical specification supplying and fixing of 80mm thick cement concrete interlocking paver block of m-40 grade of approved make,design,colour,and size made by block making machine with proper compaction fix
Sector: Municipality