Description: ROAD Name of Work S R such as Construction of CC Toe wall and pitching of embankment at Km 287 200 to 287 250 Km and Km 287 280 to 287 350 Km of LHS of NH 59 for the year 2023 24
Details: Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dressing of sides and bottoms backfilling the excavation earth to the extent required and utilizing the remaining earth locally for road work Filling foundation and plinth with sand well watered and rammed etc. complete with all cost as per clause no.304.3.7 and direction of the Engineer-in-charge Plain cement concrete (1:3:6) in foundation with crushed stone aggregates 40mm size technically mixed, placed in foundation and compacted including cost of all materials, labour, T&P etc. complete. Plain cement concrete M-20 in substructure(Walls and Slab) complete with technical specification and drawing as per section No.1 of MoRT&H specification and direction of the Engineer-in-charge. Wall Providing weep holes in brick masonry / plain or RCC abutment, wing wall and return wall with 1
Sector: Road development