Description: Construction of Pedestal for installation Statue of Saheed Baji Rout Unit 8 DAV School Chhack Bhubaneswar Dist Khurda Name of Work Conservation of Pedestal for installation of statue of Baji Rout Unit 8 D A V School Bhubaneswar
Details: Earth work in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and as per direction of the department. Sand filling in foundation and plinth with well watered and rammed. P.C.C (1:3:6) using 4cm CBHG metal R.C.C. work M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying. Cement concrete (1:2:4) with 12mm size hard broken granite chips. 16mm. thick cemet plaster (1:3) per 1Sqm Reinforcement including cutting, bending, binding etc Rigid smooth centering and shuttering for R. C. C. work. Foundation Column & Beam Fixing Granite in floors on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slurry mixed with pigment to match the shades on the tiles etc. complete..(Analyzed as per OSOR 2006 item no-VIII,16) Renovation in Khandolite stone in (1:2) cement mortar for M
Sector: Culture and Art