Details: secondary network dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the usefull materials for reuse and removing the debris within 50m. lead per 1cum dismantling and removing r.c.c columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead excavation in marshy soil earth work in slushy soil (in water upto 0.6m. depth requiring the aid of pans and vessels) within 50m. initial lead and 1.5m. initial lift as per the direction and specification of the deparment lift 0.00 to 1.50m. lift 1.50 to 3.00m. excavation in soft soil / soft murum
Sector: Municipality