Details: secondary network dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the usefull materials for reuse and removing the debris within 50m. lead per 1cum dismantling and removing r.c.c columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead earth work in slushy soil (in water upto 0.6m. depth requiring the aid of pans and vessels) within 50m. initial lead and 1.5m. initial lift as per the direction and specification of the deparment lift 0.00 to 1.50m. lift 1.50 to 3.00m. earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m. initial lift including rough dressing and breaking clods to maximum 5
Sector: Municipality