Details: dismantling & removing cement concrete including stacking the debris within intial lead and lift 50mtr lead c.c. / r.c.c work of m-20 grade with 20mm and down grade c.b chips including hoisting & laying including cost,carriage and royalty , tax of materials supplying, fitting & placing uncoated hysd bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. rigid & smooth centering & shuttering for rcc works including false works and dismantling them after casting including cost of materials complete in ground floor m.s. square jally including all cost with fitting & fixing charges etc. carraige exavated earth by truck load with in 5 k.m. lead by mechanical means including loading & unloading charges qty same as item no.1 of 75% cost of photo & signboard
Sector: Municipality