Details: ground floor earth work in hard soil or gravelley soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying on layers not exceeding 0.3m in depth and as per the direction of the engineer-in charge. filling of foundation and plinth with sand well watered and rammed including cost, convayancy & royalty etc. complete as per the direction of the engineer-in charge. providing plain cement concrete m-10 (1:3:6) mix with 40mm nominal size stone aggregate in open foundation upto a depth of 1.5m. below ground level & upto a hight of 1.5m. above ground level/bed level including cost & conveyance of all materials to site & all labour charges complete as per specification clause 802, 803, 1202 & 1203 and direction of the engineer - in - charge. providing cement concrete (1:1½:3) mix with nominal size stone aggregate in foundation upto a depth of 1.5m below ground level & upto bed level including cost & conveyance of all materia
Sector: Social Development