Description: Canal improvement Name of Work Improvement to distributary No 4 of HLC Range III from RD 13 40Km to 15 240KM
Details: Clearing shrub jungles, uprooting stumps and small bushes and trees below 1.00m girth etc. including clear of work site including all labour etc. complete including labour cess as per direction of the Engineer-in-Charge. Removal of BT surface including stacking them away from work site with all lead, lifts, delifts, cost of labour, cost for hire and running charges of all machineries, T&P, cost of fuel, lubricants etc. complete as per direction of Engineer-in-Charge. Providing, laying, spreading and compacting graded stone agreegates to Wet Mix Macadam specification including premixing the materials as per table 400-II with water at OMC in mechanical mix plant, carriage of mixed materials by tipper to site, laying in uniform layers with paver in sub-base/course well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of MoSRT&H specification for road and bridge works (4th Revision)) with all leads, lifts and delifts including cost, con
Sector: Medical Education