Details: dismantling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. dismantling and removing r.c.c. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead as per the direction of the engineer in charge.. earthwork by using hydraulic excavator of 1 bucket and depositing the excavated 3 materials within 5 km lead including loading and unloading with all cost conveyance t&p sundries etc. complete as per direction of engineer-in-charge. filling plinth with sand in layers not exceeding 20 cm in depth, well watered and compacted, top surface dressed and levelled to proper gradient including cost and conveyance of sand, all taxes and royalties, loading and unloading, all labour sundries t&p etc. complete as per direction of engineer-in-charge. providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using cement,
Sector: Municipality