Details: earth work in all kind of soil within 50 m initial lead and 1.5m. initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the eic. 14 providing spreading, filling in foundation and plinth with sand watered and rammed as per opwd specification including cost of materials, labour, conveyance, royalty, tools and plants etc.all complete required for the work to finished items of work. 18 pcc (1:3:6) with 40 mm size hg metal including all cost of materials, labour, conveyance, royalty, t&p, water for curing etc all complete. 37 blinding road surface with crusher dust including cost and conveyance of materials t&p etc 221 providing, laying, spreading and compacting grading-iii using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber,applying and br
Sector: Municipality