Details: earthwork in hard soil with initial lead and life including rough dressing & breaking the clods of maximum of 7 to 5 cm thick size leveling etc complete with all complete filling in foundation trenches and plinth with river sand, well watered and compacted in layers including cost of all labour, materilas, conveyance, royalties, t&p etc all complete as per direction of the engineer-in-charge providing and laying of c.c of grade 1:3:6 curing for the required period including cost of all labour, materials, conveyance, loading and unloading, all taxes and royalties, sundires and t&p etc all complete as per direction of the engineer-in-charge. rcc work m-20 grade using 20mm down graded size bhg cb chips including cost of all materials labour t&p etc complete. column footing plinth beam column & floor beam slab supplying, fitting and placing uncoated hysd bar reinforcement complete as per drawing and technical specification. providing fixing tiles in floors or steps and landing on 25mm thic
Sector: Municipality