Details: dismantling and removing cement .concrete including stacking the usefulmaterials for reuse and removing the debrises within 50mtr lead and cost of all labour, cess etc all complete. earth work in excavation of foundation in all kinds of hard soil within 50 mtr initial lead, 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30 mtr depths and as per specification and direction of e-i-c carriage of excavated earth by mechanical means within 5k.m. lead. supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, cess dmf and emf and additional royalty etc all complete as per the specification and direction of e-i-c c.c.(1:4:8) with 40 mm hbhg metal including cost,carriage cess dmf and emf and royalty of materials etc complete. rcc work of m20 with 20mm size black hgcb chips including hoisting & laying including cost of all materials and labour etc.
Sector: Municipality