Details: earth work in oridinary soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the engineer-in-charge filling foundation and plinth with sand and wel watered &rammedetc . complete including cost of sand . cement concrete (1:4:8) by using 4cm. size b.h.g. metal including cost, conveyance etc. complete. providing, conveying and laying moorum in sub-base in layers not exceeding 100 mm. watering and compaction to the required density in omc with prr including hire and running charges of prr and cost, conveyance of all materials etc. complete as per direction of providing, conveying, spreading 40mm hard granite hand broken metal and packing the voids with small stones and hand packing the same to proper camber including coveying spreading of filler materials and filling the intersticks by spreading the same over the surface, watering and consolidation
Sector: Municipality