Description: Construction of 3 set of two seater LOO at Ward No 47 Name of Work Construction of 3 nos of two Seater LOO at ward no 47
Details: Earth work Excavation foundation in all kind of soil in F&P within intial lead and lift including rough dressing and levelling the ground etc. complete. Re-filling of excavated earth in foundation etc comp. Conveyance of excavated earth by mechanical means within 5 km lead etc. complete. Supplying and filling F&P with river sand with well watering and ramming etc. complete. C:C: (1:4:8) using 4 cm. size H.G. metal (C.B) including the cost of all materials, labour etc complete. Fly ash brick masonry in C.M. (1:4) in founadtion & plinth and super structure using 25cm x 12cm x 8cm brick having crushing strength not less than 75 Kg / cm2 Super structure Fly ash brick masonry in C.M. (1:6) in founadtion & plinth and super structure using 25cm x 12cm x 8cm brick having crushing strength not less than 75 Kg / cm2 R.C.C. work of M25 grade with 20 mm down grade chips (C.B.) including Hoisting & laying. Supplying, fitting & placing uncoated HYSD reinforcement including cutting, bending,bindi
Sector: Municipality