Details: earthwork excavation in hard soil in foundation & plinth within 50.0m intial lead and 1.5m intial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30m in depth and transporting the excavated materials by mechanical means within 5km led from work site. supplying and filling of sand to the foundation bed of columns pit, wall foundation and inside the filling with well watered and rammed etc and complete as per the direction of e.i.c. rcc of m20 concrete using 20mm and down grade crusher broken hard granite chips including hoisting and laying all cost of materials, labour, conveyance, royality, cess, tools and plants water for curing etc. all complete, as per opwd specification required for the work to finished items of work etc. complete. providing, laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the materials with water at omc in mechanical mix plant, carriage of mixed m
Sector: Municipality