Details: item description/ heading upkeeping of weighbridges by engaging one unskilled labour per day for each weighbridge including daily brooming and weekly mopping of floor in the control room, cleaning of glass panes/wooden panels of window door shutlers, furniture, window grills etc of control room, cleaning of weighing platform, load cell, its support structure, approach to the plattorm,spillage coal from under the platform etc as per the direction of engineer-incharge including the cost of all consumables like brooms, detergents, phenyle etc. (one labour to be deployed in each weigh bridge per day with as per convenience of the eic) removal of unserviceable soil with disposal upto 1000 metres removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. total impact of gst plus labour cess [@ 1 % (bocw cess to be deducted from the ra bill as per the value of the
Sector: Mining